Sign In | Join Free | My hardware-wholesale.com
China Qingdao KXD Steel Structure Co., Ltd logo
Qingdao KXD Steel Structure Co., Ltd
Verified Supplier

1 Years

Home > Steel Structure Workshop >

Steel Pallet Packed Portable Steel Structure Fabrication Prefab Warehouse Storage Workshops Plants

Qingdao KXD Steel Structure Co., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Steel Pallet Packed Portable Steel Structure Fabrication Prefab Warehouse Storage Workshops Plants

Brand Name : KXD

Model Number : S-0043

Certification : CE, ISO, SGS

Place of Origin : Qingdao, China

MOQ : 500 square meters

Price : US$ 50-80 per square meter

Payment Terms : L/C,T/T

Supply Ability : 3000 tons per month

Delivery Time : 30-40 working days

Packaging Details : bulk for steel panels, steel pallet for steel structure, wooden box for small installing accessories

Dimensions : Customers' Requirement

Door : Sliding door or rolling door

Color : Client's Request

Visit : Workshop Visit And Check Available

Surface : Hot-dip Galvanized / Painted

Frame : Steel structure

Lifetime : over 50 years

Structure Type : High Strength Steel Structure Frame

Model No : KXD-SSB130

Prefabrication : Off-site

Installation : Fast

Contact Now

Processing Steps of Prefabricated Steel Structure Buildings:

Planning and Design

Prefabricated steel buildings starts with a detailed planning and design phase. During this stage, the project’s requirements are identified, and the building’s specifications are established. Factors such as size, layout, and intended usage are considered to ensure that the final design meets the client’s needs. The planning phase also includes obtaining necessary permits and approvals, as local regulations may impact the building’s design.

Fabrication in the workshop

Once the design is finalized, the components are manufactured in a factory. The use of advanced technology in the manufacturing process ensures that the components are of high quality and precisely engineered for quick assembly.

On-Site Assembly

After the prefabricated components are transported to the site, the assembly process begins. Since the parts are pre-engineered, they fit together seamlessly, making the installation process much faster than traditional construction methods. A skilled team of workers assembles the steel frame, attaches the wall panels, and installs the roofing system. Depending on the size and complexity of the building, the assembly process can take anywhere from a few days to a few weeks.


KXD Design Service:

We own more than 20 engineers who have abundant experience for various types buildings. Before design, all requirements will be collected from clients. The design will obey the requirements and pass the calculation check by the architectural soft, such as CAD, PKPM, 3D3S etc.

Steel Pallet Packed Portable Steel Structure Fabrication Prefab Warehouse Storage Workshops Plants


KXD Production Service:

Armed with cutting-edge tools and adhering to industry-leading standards, we ensure the structural integrity and premier performance of each creation. Driven by innovation, we merge unwavering professional ethics with an unstoppable drive to transform intricate engineering specifications into extraordinary steel masterpieces.

Steel Pallet Packed Portable Steel Structure Fabrication Prefab Warehouse Storage Workshops Plants

Steel Pallet Packed Portable Steel Structure Fabrication Prefab Warehouse Storage Workshops Plants


KXD Install Service:

We will offer detailed drawings to guide your installing process. Meanwile, we still offer free technical questions solve in time. And further we offer different plans to choose for different demands.

On-line technical guide in time; 1-2 engineers to guide on site; Our installing team process all assemble for the client.

Steel Structure Building Installation steps:

1.Foundation construction (pre-embedded anchor bolts),

Installing detailed drawing will be offered in advance.

2. Column installation

One worker commands truck crane how to move, 3 ~ 4 workers cooperate with crane to install the steel column, put column to anchor bolt location.

3.Beam installation

After completing the installation of adjacent two steel column, then main beam begin to install.

4.Installing roof & wall purlin

The roof and wall purlin will be installed after finishing column and beam. Bolting the purlin on the main structure.

5.Fixing wall and roof sheet

To fix the wall sheet on wall purlin by self-tapping screw; then fix the roof sheet.

6.Fixing the cover

To install the cover on the corner, eave, window and door opening.

7.Install windows and doors.


Your Building details confirm to get the design & quotation:

Size Length × Width × Length
Building Application its exact usage or special requirements
Roof & Wall material Steel sheet ? Insulated Panel ? Decorative Panel?
Crane yes or not? Ton?
Wind Load wind speed km/h or m/s or mph?
Snow Load snow weight kg/m2 or snow thickness or Kn/m2?
Door & Window

Sizes? Quantity? Layout?

Inner Layout

Partition room?

More options

Parapet? Skylight? Ventilation? Canopy? Glass wall curtain?


Welcome to Contact further & Visit!


Product Tags:

Prefab Steel Structure Workshop

      

Steel Structure Fabrication Workshop

      

Portable Steel Structure Workshop

      
China Steel Pallet Packed Portable Steel Structure Fabrication Prefab Warehouse Storage Workshops Plants wholesale

Steel Pallet Packed Portable Steel Structure Fabrication Prefab Warehouse Storage Workshops Plants Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Qingdao KXD Steel Structure Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)